Calculating 90% rainfall compliance

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Simon Sue  on 

We're currently working on a high-rise commercial building, and hope someone could shed some lights on the following questions: 1.

1
Tue Dec 6, 2011, 5:35 pm

HVAC on a green roof calculation

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Petr Vogel  on 

Hello, we are working on the project of a new commercial building where green roof is about 50 % of the whole roof.

1
Wed Nov 30, 2011, 3:33 pm

Documentation

NC-2009 MRc4:Recycled Content
posted by  Maura Adams  on 

Do I need to enter every single material used into the spreadsheet, or can I stop once I've reached the 10% or 20% threshold? Please tell me it's the latter!

1
Wed Nov 30, 2011, 3:46 pm

WEp1 - Children's Water Closets Water Use

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ross Spiegel  on 

I am working on an elementary school project with flush valve type water closets sized for young children.

1
Wed Nov 30, 2011, 4:47 pm

OPTION 3 - Survey Time

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  WAGNER OLIVEIRA SILVA  on 

We have same dubs about survey time.

1
Sat Dec 17, 2011, 3:17 am

Definition of Non-Structural Products and Materials

Pilot-Credits PC43:Certified Products
posted by  Chloe Bendistis  on 

Hello, I cannot find a definition for "non-structural products and materials" and I was wondering if someone could point me in the right direction.

0

Naturally Ventilated Corridors

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Matthew Macko  on 

Do corridors need to have access to operable windows within 25 feet?

1
Fri Dec 2, 2011, 7:56 pm

Material Values

CI-2009 MRc4:Recycled Content
posted by  Holly Himes  on 

On the IDC Materials Calculator download from LEED-online states in footnote 2 that material value must "include all expenses to deliver the material to the project site, including taxes and delive

1
Mon Dec 19, 2011, 2:27 pm

LEED NC 2.2 – Sunset Date

LEED Rating System Selection
posted by  Bryan Waters  on 

We have a project registered under LEED NC 2.2- After completion of Construction Documents of Phase 1; the project went on hold over a year ago. No submittals have been made to GBCI.

1
Fri Dec 2, 2011, 2:08 pm

Modeling Multiple Buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

I am working on a new project which consists in 5 buildings, all have its own HVAC system designed, 3 of them have a complete HVAC, and the other 2 will only have Mechanical Ventilation to cool the

1
Thu Dec 1, 2011, 7:30 pm