irrigation from onsite pond
NC-2009 WEc1:Water Efficient Landscapingposted by renee golobic on
An irriation pump was installed that supplied the need water for irrigation for the onsite pond. We sumitted this was a non potable irrigation for 4 points.
Floor area calculating
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mohamed Ravuthar, LEED AP, BD+C on
my question is how to calculate the sq ft area of the particular room to find out the window to floor ratio ?How to assume that the window area is covered this much area.
OPR Format - Tabular vs. Narrative
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Maya Karkour on
Dear all, Can the OPR be written in a tabular form, instead of a narrative, especially that we are not required to upload this? Thanks!
University Dormitory
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Patti Gunderson on
This project includes 49 apartment-style dormitory spaces, all of which have multiple occupancy.
Lighting Compliance - 2003 - Texas
CI-2009 EAp2:Minimum Energy Performanceposted by Jamie Angulo on
Our restaraunt is about 50% over the current allowed wattages. What can we do to drop it? Does 'graphical lighting' have to be counted in the total?
Estimating credit acheivement
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Amanda Ross on
1) Does anyone know of any local/regional programs with the 80% standard in the Vancouver, BC area?
Definition of "Outdoor Air"
NC-2009 IEQp1:Minimum IAQ Performanceposted by James Chueh on
We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces s
SSc7.2 Option 3
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Markus Henning on
In my project I will achieve the requirements of SSc7.2 with option 3. The roof is covert by 10% green roof and 60% white gravel and …..
New construction, catering facilities
posted by Carlos Alberto Hoyos Soto on
Hello, I want to know which rating system I should use; the Project is a new catering facility. Should I use core and Shell or new construction? Thanks
Charging stations for oversized parking lot
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Thomas Gragnano on
We are working on an adaptive re-use project where the client has purchased an existing manufacturing facility and it is being coverted for use as an office and testing lab for a research institute