IAQ Procedure as ASHRAE 62.1 Compliance Path

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Laura Case  on 

ASHRAE specifies that the Ventilation Rate Procedure or the IAQ Procedure can be used to ensure that mechanical ventilation systems meet ventilation requirements in ASHRAE 62.1 (Section 6.1).

1
Wed Aug 24, 2011, 11:53 am

Prescriptive Method - multiple VLT types

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Dana Murdoch  on 

Hi - I'm using the Option 2 - Prescriptive Approach for this credit, and I'm running into a few issues regarding the provided Excel spreadsheet.

1
Thu Aug 4, 2011, 6:14 pm

Landscape irrigation baseline in California

NC-2009 WEc1:Water Efficient Landscaping
posted by  Brightworks Sustainability  on 

With the new state wide green building code and local municipal requirements for landscape irrigation, how is a baseline developed when regional requirements now approach what was a 50% reduction?

1
Wed Jul 27, 2011, 7:36 pm

WE Pr1 - What does ADO stand for in the Process Water Use Sect?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Edna Bartolomei-Diaz  on 

We are using LEED 2009 for Retail: NC+MR templates, for one of our projects. In WE Pre-requisite 1Template, there is Process Water Use section. One of the column is named ADO.

1
Thu Dec 8, 2011, 2:49 pm

Simple simulation question

NC-2009 EAp2:Minimum Energy Performance
posted by  Timo Marquez  on 

This might be a rather simple question, but would like avoid confusion.

1
Mon Sep 19, 2011, 4:35 pm

Credit completion

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Sally Marr  on 

I have completed filling out the template for the prescriptive path, including over 75% daylit space, when skylight and window areas are combined, yet the template summary is still showing '0 point

1
Sat Sep 3, 2011, 12:21 pm

EAC1 - Day Lighting & Other Lighitng controls input

NC-2009 EAc1:Optimize Energy Performance
posted by  susan eguia  on 

Hi, We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits.

1
Thu Sep 8, 2011, 3:03 pm

5% Requirement Clarification

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Marie Gruel  on 

I have a zero lot line project, so all landscaped areas are within planters on the plaza level, or in tree wells in the sidewalk.

1
Fri Jul 29, 2011, 5:21 pm

LEED- CI PI Form 3

General forums
posted by  Holly Himes  on 

Do I need to list out office space versus conference room versus copy room etc. on the Space Usage Type of this form?

1
Fri Jul 29, 2011, 4:46 pm

PI Form How to calculate FTEs

General forums
posted by  Holly Himes  on 

I am confused on the Occupant Information section. We are building a conference center which will most likely have non 8-hour work days. How do I calculate FTEs. Does someone have a FTE tool?

1
Fri Jul 29, 2011, 4:43 pm