IAQ Procedure as ASHRAE 62.1 Compliance Path
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Laura Case on
ASHRAE specifies that the Ventilation Rate Procedure or the IAQ Procedure can be used to ensure that mechanical ventilation systems meet ventilation requirements in ASHRAE 62.1 (Section 6.1).
Prescriptive Method - multiple VLT types
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Dana Murdoch on
Hi - I'm using the Option 2 - Prescriptive Approach for this credit, and I'm running into a few issues regarding the provided Excel spreadsheet.
Landscape irrigation baseline in California
NC-2009 WEc1:Water Efficient Landscapingposted by Brightworks Sustainability on
With the new state wide green building code and local municipal requirements for landscape irrigation, how is a baseline developed when regional requirements now approach what was a 50% reduction?
WE Pr1 - What does ADO stand for in the Process Water Use Sect?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Edna Bartolomei-Diaz on
We are using LEED 2009 for Retail: NC+MR templates, for one of our projects. In WE Pre-requisite 1Template, there is Process Water Use section. One of the column is named ADO.
Simple simulation question
NC-2009 EAp2:Minimum Energy Performanceposted by Timo Marquez on
This might be a rather simple question, but would like avoid confusion.
Credit completion
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Sally Marr on
I have completed filling out the template for the prescriptive path, including over 75% daylit space, when skylight and window areas are combined, yet the template summary is still showing '0 point
EAC1 - Day Lighting & Other Lighitng controls input
NC-2009 EAc1:Optimize Energy Performanceposted by susan eguia on
Hi, We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits.
5% Requirement Clarification
EBOM-2009 WEc3:Water Efficient Landscapingposted by Marie Gruel on
I have a zero lot line project, so all landscaped areas are within planters on the plaza level, or in tree wells in the sidewalk.
LEED- CI PI Form 3
posted by Holly Himes on
Do I need to list out office space versus conference room versus copy room etc. on the Space Usage Type of this form?
PI Form How to calculate FTEs
posted by Holly Himes on
I am confused on the Occupant Information section. We are building a conference center which will most likely have non 8-hour work days. How do I calculate FTEs. Does someone have a FTE tool?