Forum quick links
Percentage of finished floor complying for the credit
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Dario Ibarguengoitia on
MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?
Re: Addition to LEED Certified Building
posted by David Posada on
I've not heard of re-submitting an already certified building other than pursuing EBOM.
Calculator
EBOM-2009 EAc1:Optimize Energy Performanceposted by Austin Evans on
In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell.
Gross Lighted Area - ASHRAE 90.1-2007
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Trevor Karstens on
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum 10% light
Does Automation promote integrated design?
posted by Nadav Malin on
On the page about Pilot Credit 5 John Albrecht proposed that Automation enabled project management tools can help make the design process more integrated.
Reference building - garage
CS-2009 EAc1:Optimize Energy Performanceposted by Adam Targowski on
In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above.
ASHRAE compliance with naturally ventilated building
NC-2009 EAc1:Optimize Energy Performanceposted by Jean Marais on
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat
Distribution and Vintage of REC's purchased in a Portfolio
NC-2009 EAc6:Green powerposted by Eric Elizondo on
Our client is a national banking program that has purchased REC's as a corporation in 2010 and 2011 as part of a corporate portfolio program.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-Site Renewable Energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
SS 1 Option 2 Path 9
CI-2009 SSc1:Site Selectionposted by Augusto Velazquez on
I am having trouble filling out the LEED Online template for option 9.