Forum quick links
Building Slabs: not in Developer's scope of work
CS-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope).
LEED matrix
posted by Tristan Roberts on
Sarah, have you seen this LEED matrix spreadsheet? It is a matrix of linkages across credits.
Method Choosing
EBOM-2009 EAc1:Optimize Energy Performanceposted by Austin Evans on
This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other.
Participation in Online Forum
Pilot-Credits PC6:Integrative Project Planning & Designposted by Miranda Gardiner on
You state the participation in the online forum is required for credit submission....but what does this exactly mean (e.g., does this question warrant participation?) and how should a team document
Multiple Projects pursuing Pilot Credits 5&6
Pilot-Credits PC5:Preliminary Integrative Project Planning & Designposted by Miranda Gardiner on
I have several projects planning to pursue PC 5&6 - how does this translate for online participation? Am I required to participate separately for each project?
Bldg Footprint_Cooling Tower & Generator
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Nancy Goshow on
We have a cooling tower and emergency generator adjacent to our building that is on a concrete pad and surrounded by a screen enclosure. Should this area count as part of the building footprint?
Instantaneous and/or totalized
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by James Gray on
For natural gas metering applications, is continuous logging of instantaneous flows a requirement? Most meters just put out totalized pulses, so I'm assuming that's fine... Any thoughts?
Designated smoking area in a loading dock
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jessica Jones on
Can you please comment on whether the following approach would be acceptable to achieve this prerequisite: A project building is attached to a loading dock on the property, and the designated smok
Floated tile paving and Heat Island Effect
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Mauricio Ramirez on
I have a building that has in the most part of their roof, a floating tile paving, that creates an air-chamber between the slab of the roof and the tilies of the paving.
MPR supplement re parking garage no longer cerifiable
posted by joseph porrovecchio on
The change applied to parking garage certification is unfortunate and short sighted.