Climate zone outside the USA
NC-2009 EAp2:Minimum Energy Performanceposted by Xing Shi on
We just finished the design submittals of 2 projects in Jiangsu, China. Does ASHRAE set climate zone in China.
Average time expenditure for LEED Project Administration
posted by KC Kurtz on
All -- I work for a small Design-Build company in Durham, NC and we are looking to certify our new office building (12,000 sq. ft adaptive reuse) through LEED Core and Shell Rating system.
Showing a reduction?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by American University on
I'm unclear as to how we show a reduction in stormwater runoff. I see how we calculate the current runoff by figuring the area type and using the formula given, but what does that get compared to?
Process loads different between proposed & baseline designs
NC-2009 EAc1:Optimize Energy Performanceposted by Santiago Rodriguez on
For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment.
When to use Table vs. Spec rated power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Shook on
Can someone clarify when to use the Table 2 rated power number vs. specification rated power. My example: Have 90 new computer monitors going into the project.
HVAC Equipment Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sobral on
Dear LEED Users, Does anybody know if the minimum HVAC equipment efficiencies listed in Tables 6.8.1 of Standard 90.1 apply to the generator (i.e chiller, boiler, heat pump) or to the whole HVAC
Demand Control Ventilation
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dylan Connelly on
I have a small TI project with 14 small rooms (
Unusual Building Construction
NC-2009 EAc1:Optimize Energy Performanceposted by Tom Nichols on
We are working on an eQuest model of a very unusual building. It was constructed in 1911.
LEED Core and Shell: Energy Performance Improvement
CS-2009 EAc1:Optimize Energy Performanceposted by Jeann Vieira on
When modeling a building under the Core and Shell system, do I have to compare the energy performance only between systems under the project scope, i.e. Core and Shell?
Baseline?
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by breeze glazer on
We are looking to pursue this credit on a project, both to participate in the pilot process, but more importantly, as a means to select energy efficient medical equipment.