Daylight measurement
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Rubén M. R. on
I found the following reference guide addendum about the daylight measurement path: In the requirement it says: "Measurements must be taken on a 10 foot grid.." and in the calculations section it s
Forms and Energy Star Equipment
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sue Barnett on
The EA 1.4 is self populated by EAp2.
Option 2: Process Water
EBOM-2009 WEc1:Water Performance Measurementposted by Austin Evans on
My manufacturing facilty has more than one kind of process type water user, and they are very distinct.
Waterstops and EAc4.1
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Molly Jones on
We have a project that uses a waterstop in an elevator pit. The waterproofing is on the exterior side of the concrete.
Monitoring Humidity?
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Ara Massey on
I am currently working on a project in southern Colorado (very dry) that is doing a phased flush-out but there is currently no way to monitor interior humidity.
Schedule of Values from GC - can we use the 45% default in EBOM?
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by candice groves on
In LEED NC, when given a price from a subcontractor, we're able to use a 45% default for the actual material cost in order to exclude labor from that price.
Pool SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Luis Miguel Diazgranados on
Hi What about a pool? In this project we are working on, there will be a pool in a terrace on the roof. What would it be it's SRI? Or does it depends on the tiling used under water?
Classroom and Lecture Halls Building on a University Campus
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lisa Chow on
Hello, My building is located on a university campus and contains just 2 classrooms and 3 lecture halls (~15.5 ksf).
Clarification of wording
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gary Atkins on
In attempt to clarify the wording for IEQ4.1 and IEQ4.2 that states "...defined as inside the weatherproofing system and applied on-site..." does this mean that both conditions must be satisfied fo
Additions to Credit Language
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by David Weimann on
Hi Brendan, pilot credit 2 obviously correlates with Green Guide for Healthcare EP Credit 3.1-3.5 "Toxic Chemicals Reduction".