Forum quick links
CA 01350 Compliance
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Peter Doo on
From the LEED User "Bird's Eye View" for this credit: However, earlier versions of LEED for Schools were able to follow a USGBC (https://www.usgbc.org/ShowFile.aspx?DocumentID=4311) erratum allowi
existing furniture moved to new office
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Elizabeth Eason on
MRc3.3 & MRc5 We received the comment below. I am still a little confused.
Removing Parking in a Major Renovation Project
NC-2009 IDc1:Innovation in Designposted by Shannon Roberts on
I am working on a major renovation project in which the client has agreed to remove 25% of the existing parking spaces and replace the asphalt with native meadows.
Pedestrian Area
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Rubén M. R. on
Does pedestrian areas located in the roofs count as open space?
The light fixtures currently
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Austin Evans on
The light fixtures currently installed meet the specified criteria however what do you do if the bulbs were replaced not too long ago and their lifetime will outlast a 2 year window.
Comments from a LEED review
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Raphael Sperry on
We just received comments on a review of this credit I am trying to understand. For this project, we actually had an approved MV plan from LEED NC credit EAc5.
cutsheets?
CS-2009 MRc6:Certified Woodposted by Sara Neff on
I'm confused on whether or not we need to provide product cutsheets, or if the invoices (line item, with dollar values and the CoC # and everything) are all we need to document this credit.
Are local SmartCommute Programs compliant with Option 2?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by John Kinch on
I see that the SmartCommute program is referenced as a way to provide incentive to building occupants to increase alternative commuting to work.
Manufacturing Plant Addition - Option 3
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Wascher on
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.
Lost IAQ Photos
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Melissa Wrolstad on
I am working on a project with an IAQ plan that was followed during construction.