Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Permanent entryway walk-off systems at least 10 feet long

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Gendel Metlitsky  on 

Q #1: We are working on design of 10-story school in downtown of the major US city. Design calls for roof play yard.

1
Wed May 18, 2011, 12:37 pm

T(vis) as a %

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Brynn Horley  on 

LEED (Canada) is requiring minimum T(vis) of 0.4 A manufacturer has provided me information which says that their product is 33% Visible Transmittance.

1
Wed May 25, 2011, 12:08 am

VOC Excluding Exempt and Including Exempt

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Alan Bernstein  on 

I have two products that were used on our project. A primer and paint. The cut sheets from Manufacturer state the VOC Content is: Excluding Exempt: 275g/l and the Including Exempt is 103 g/l.

1
Thu May 19, 2011, 3:25 pm

Operable Windows

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Miguel Diazgranados  on 

We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.

1
Wed May 18, 2011, 11:30 pm

Baseline and design system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  Bala Srini  on 

Our semi industrial building's production area does not have cooling system, Proposed model simulated based on ASHRAE 90.1-2007, Table G3.1, 10. HVAC No.

1
Fri May 20, 2011, 5:44 am

No Smoking Signage at Retail Entrances

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Jessica Hawley  on 

I have a building with several ground-floor retail spaces.

1
Wed May 25, 2011, 3:50 am

Table SSc7.1-2 not populating

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  sara frye  on 

I have posed this question to LEED help but they have still not gotten back to me and I am getting impatient.

1
Tue Jun 7, 2011, 8:31 pm

Counting of on-site / off-site parking

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Erin Holdenried  on 

We have a non-residential new construction campus project where the local authority has recommended 1028 spaces (no minimum or maximum).

1
Fri May 20, 2011, 3:30 am

Hand Dryers- Are they Considered Durable Goods?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Geoffrey Tomlinson  on 

We are purchasing hand dryers to eliminate paper waste, but since there are no EnergyStar rated hand dryers, would this count against us for our durable goods purchasing the performance period?

1
Thu May 26, 2011, 9:26 pm

keeping LEED records

General forums
posted by  Tristan Roberts  on 

Reynaldo, can you clarify what you have in mind? What records are you keeping, and for what purpose?

0