Forum quick links
Athena calculator questions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Laura Whitehurst on
1. What is the difference between an open web steel joist and a plain steel joist?
Grasscrete for Fire Lane
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Norma Lehman on
I understand that turf is not compliant "native and adaptive ", but is there an exception for using Grasscrete for the fire lane instead of paving?
USGBC responses to comments on LEED Interpretations
posted by Cara Mae Cirignano on
Thanks to all those who have commented, and to Tristan for the article. We’ve been working hard on the LEED Interpretations program, and we’re excited to get Phase I out to the world.
Must submeters not within Option 2 list be read weekly?
EBOM-2009 WEc1:Water Performance Measurementposted by Vanessa Seibert on
We have a main, fire water and irrigation meter. If read weekly and calibrated properly we have what is needed to obtain 2 points in this credit.
PE Stamp on SEP
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Carrie Bradley on
EAc1 and EAp2 don't require a PE seal. Is it really required on the SEP submittal for this credit?
Multiple buildings under 1 LEED-NC 2009 project
posted by Mark Meaders on
I have a LEED-NC 2009 project that was registered in June 2010 (before the 2010 AGMBC was published). It is a 3-building project on part of a larger campus.
Waterfront sites
posted by James Weingarten on
Can a project boundary extend into a lake? I have a Department of Natural Resources building located on a lakefront. They have a public boat landing on site.
Weekly Meter Readings
EBOM-2009 WEc1:Water Performance Measurementposted by Wendy Gibson on
I am wondering if the weekly meter readings need to be done on the same day every week?