Forum quick links
IAQ managent - real live pictures
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Susann Geithner on
Here are some real live applications for IAQ management during construction http://on.fb.me/vboaSs
Possible Change from Existing Single Bldg to Multi/Campus
posted by Elliot Powers, LEED AP BD+C on
A bit of a twist from most of the queries above, this deals with a single building already registered as such (NC) but which is on a multi-building campus of existing buildings.
Building's occupants using a neighboring car park
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Doyoon Kim on
We have a project were we are not building any new car parks, The project building has its origins from late 19th century, so it doesn’t even have the potential, space or local government approval
Calculations
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Sheela I on
California has sizing guidelines for recycling areas. Do we need to use this % vs SF for any other state? Our project is in PA.
LEED GA help
posted by Tristan Roberts on
Ashraf, congratulations on being a LEED AP, and it's great that you want to lead an educational effort there.
I"m not sure exactly what your question is, however -- can you clarify?
LEED CI Retail - Restaurant Kitchen Equipment
CI-2009 MRc4:Recycled Contentposted by Susie Spivey-Tilson on
We are doing the MRc4 and MRc5 calcs for a restaurant i that is using the LEED CI 2009 Retail rating system.
Is this recycled material.
NC-2009 MRc4:Recycled Contentposted by Peter Doo on
In the wake of recent storms, a municipality has collected and stored logs from falled trees that have been cleared.
Questionnaire
posted by Devran Bengü on
Questionnaire: 1.What are the main drivers for choosing LEED certification system? 2.Have these expectations been met? 3.Did you set any measurable evaluation criteria for meeting these expectation
Red Color High SRI?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Omer Moltay on
Has anybody heard of red colored roofing membrane that could provide an SRI >78? Thanks you for any tips.
IAQ testing and furniture (new and used)
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Melissa Schwartz on
I have a four story project where we are doing IAQ testing in phases because of a tight schedule. All workstations and new furniture will be installed prior to the testing of each floor.