Project Site Boundary Includes Existing Building

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Andrew Oxley  on 

Our project site includes the LEED project (new building) and a separate (not connected) existing building that will remain.

1
Thu Dec 6, 2012, 3:03 pm

Paving as part of Construction Costs

NC-2009 MRc4:Recycled content
posted by  Mariah Grife  on 

The new LEED language has clarified that 32.10.00 Paving should be included in the construction costs. However, the only paving that will occur on my project's contract will be in-street paving p

1
Fri Nov 30, 2012, 3:23 am

P1 form 4: Date team expects to make first LEED submittal

NC-2009 PIf4:Schedule and Overview Documents
posted by  John Eden  on 

If we are doing split review should this date be for the Design Review?

1
Mon Dec 3, 2012, 8:29 pm

Only LEED CS inside proj. boundary

ND-v2009 GIBc1:Certified green buildings
posted by  Karyn Rodrigues  on 

Considering that we have 6 LEED CS-certified buildings inside project boundary.

1
Mon Dec 3, 2012, 3:15 am

combine rail and bus for exemplary performance

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Courtney Royal  on 

hi, i was wondering if its possible to use a combination of subway and bus lines to achieve an ID EP credit. I think we've done that in the past, but I can't remember! Thanks!

1
Mon Dec 3, 2012, 8:51 pm

Wind Energy

CS-2009 EAc6:Green power
posted by  LEED Pro Consultant  on 

Hi, We are working on a project in Mexico. In order to comply with the credit requirments its valid to purchase electricity directly from a wind farm also in Mexico to get the points?

1
Fri Nov 30, 2012, 2:26 am

Served by part of large air-conditioning system

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Shirong Meng  on 

If the project spaces are served by a large VAV system which has mixing of central Outside air inlet and recirculation air, but the VAV system is also serving other tenant spaces.

1
Mon Jan 21, 2013, 8:13 pm

90.1 Envelope Requirements

NC-2009 EAp2:Minimum energy performance
posted by  Ruben Porter  on 

I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th

1
Fri Nov 30, 2012, 4:51 pm

Appeal submitting period

General forums
posted by  eirini matsouki  on 

hi there, one of our porjects is been denied a pre-requisite (EAp2) during the final design review and hence the project has entered the appeal process (enetring the 'design appeal review' - within

1
Wed Dec 5, 2012, 9:09 pm

Covered Loading Dock - What is a parking space?

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Richard Woodward  on 

We are working on an urban alteration project which extends an existing building to cover an exterior loading dock, enclosing it within the new building.

1
Thu Dec 13, 2012, 9:41 pm