Site Boundary
posted by Cynthia Estrada on
Phoebe, The buildings must be physically distinct, and have unique addresses or names among other issues according to the Minimum Program Requirements Supplemental Guidance.
Super 8 Motel - comply with 10 units per acre
NC-2009 SSc2:Development Density and Community Connectivityposted by Thomas Boyd on
Can a super 8 motel be used as a residence documenting 10 units per acre if the operator is leasing rooms on month to month basis?
EPP certification for proof of recycled content?
NC-2009 MRc4:Recycled Contentposted by Renee Shirey on
Has anybody ever had an issue with using an EPP certified product to gain recycled content for a project?
Design Appeal and Construction Submittal
posted by J Morrison on
We had run into the issue that before we accepted the Design appeal we could not upload anything to our project site.
Exemplary Performance
NC-2009 MRc7:Certified Woodposted by J Morrison on
Have been having difficulty uploading documents for this credit. I called the 800 number and they said that they were having technical difficulties and to try again later.
Appeals
posted by J Morrison on
Is there a limit to the number of appeals? The cost is so much per credit on appeals if I understand correctly?
Cost info on LEED EBOM
posted by James Doyle on
For LEED EBOM cost info look at info in document from Environmental Defense Fund / edf.org titled Climate Corps Handbook Energy Efficiency Investment Opportunities in Commercial Buildings / FOURTH
Fluid Applied Air Barriers
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nilo Regojo on
We are a General Contractor working on a school project and the specs require submittal of product data for the air barrier as part of IEQc4.2.
No new parking except for 3 LE/FE spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nelina Loiselle on
I'm working on a campus building where we have added only 6 new spaces (3 of which are ADA) I understand the ADA can be exempted, but since the other 3 new ones are being added to be reserved for L
Having Trouble Getting Compliance for EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Brian ORourke on
I am working on a LEED project and we hired an engineer to run an energy model on EQuest.