Combining option 1 and 2
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Mathilda Jonsson on
Hi Of all 60 parking spaces only one is located above ground. We really want to put open-grid paving as material for this parking space that is not under ground.
Case 1 Option 2
CI-2009 EAc3:Measurement and Verificationposted by breeze glazer on
We have a situation where the tenant space, is within a building owned, by the owner.
FTE Calculation for Movie Theatres
posted by Nilo Regojo on
We are calculating FTE for a 2,500 seat, 14 screen movie theater. There will be 20 Full Time Employees but the number of patrons (Peak Transients) will vary greatly.
Hi,
Does anyone know if the
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Diego Prada on
Hi, Does anyone know if the car parking lifts can be used for preferred parking?? Thanks
Project Site Area vs. LEED Boundary Area
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Breana Detzler on
We are currently doing a project registered under LEED for Schools 2007 and have a LEED Project Boundary that does not include the existing bus maintenance facility or a portion of the existing pa
Preferred file format for plan uploads - PIF4
posted by Lew Bonadies on
When uploading floor plans, site plans, elevations etc. are pdf files the accepted format, or can we use the new Autodesk Design Review dwf file format?
Missing LEED information for some items
CI-2009 MRc4:Recycled Contentposted by Sandra Eremic on
There are a few items in my project for which LEED information is not available - like desk lamps, desk pads, hangers, coasters, even some fabrics. Can I still submitt for the credits?
LEED EBOM
posted by Emily Catacchio on
Hi Qiang,
You could try this video. Not sure this is exactly what you're looking for, but it's a start.
Water Closet Baseline
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Brandon Dark on
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building.
C&S scope
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors.