Forum quick links
Error Message when trying to select Complete
EBOM-2009 WEc1:Water Performance Measurementposted by Cynthia Fowler on
I get the following message when I try to click "Complete" for the credit: "...Form shows that documentation requirements have not been met..." I checked and rechecked and verified that all the doc
Enhanced CX 'Design Firm'
NC-2009 EAc3:Enhanced Commissioningposted by Julianne Laue on
If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?
Bike storage for residents with disabilities?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Stefania Minotti on
I’m presently working on a mid-rise residential social housing building with 5 stories and 76 units. 67 of these apartments are 1 bedroom and 9 are two bedroom.
Items to be implemented for EAc2.2
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Mark Campbell on
It is clear that the low cost/no cost items uncovered during the investigation phase in EAc2.1 must ALL be implemented to satisfy the requirements of EAc2.2. My Question: Must ALL of the low-cost/
Reducing Building Floor Space
NC-2009 IDc1:Innovation in Designposted by David Hubka on
I am involved with a project in which the design team would like to select compact storage bins.
Lighting Controls
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by shaun Andriano on
Our IEQc6.1 credit was approved during the design phase based upon the following: The space is a large open area with cubicle workstations.
Submittals - does one need to upload spec sheets?
CI-2009 WEc1:Water Use Reductionposted by Patricia Ewanski on
Simple question - My project is not yet registered so I can't see what documenation is necessary to substantiate claims of water efficiency.