Forum quick links
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?
NC-v4 SSc2:Site development - protect or restore habitatposted by Kathy Wong on
Hi all,
Collection rainwater area outside the boundary - SS Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Juliana Candido on
We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered.
Concrete Mixes Counting as Separate Products - One EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on
The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition.
Any HAP file that contain both of the proposed building and the baseline
NC-v4 EAp2:Minimum energy performanceposted by Mohamed Abdelrahim Abdelaal on
I’m new in modeling, I have a building need to be simulated for leed rating, Can you please share a "HAP" file that contain both of the proposed building and the baseline for any project as a sampl
IN - Heat Island Mitigation with Cool Walls
NC-v4.1 INc1:Innovationposted by Jorge Ramírez Hernández on
Greetings,
Pilot Inclusive Design
Pilot-Credits INpc125:Inclusive Designposted by Laurie Johnson on
I am working on a LEED CI and WELL at Scale project.
Number of seating spaces vs wheelchair space
Healthcare-v4 SSc7:Places of respiteposted by Priscillia Champagne on
Credit language :