Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Assigned Team Role: Leed v2.2

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Elle Brown  on 

How important is it that the person associated with the 'Assigned Team role" in the Claim of Credit Status matches the name on the uploaded credit template Is it necessary for me to go into each cr

1
Mon Aug 20, 2012, 12:13 pm

Addition to existing building

Schools-2009 EAp2:Minimum Energy Performance
posted by  mital patel  on 

We have a existing building that is LEED Silver and we are adding to same building. New addition is also LEED Silver. Do I need to model both existing and new addition or only new addition.

1
Mon Jul 30, 2012, 5:13 pm

LEED HC or LEED CI

LEED Rating System Selection
posted by  Bryan Waters  on 

We have a single floor OR renovation project in a 4 story Hospital building. Can it be pursued via LEED for Commercial Interiors or do we need to puruse via LEED for Healthcare?

1
Wed Sep 5, 2012, 2:43 pm

Major Renovation of an Existing Building - To lease

LEED Rating System Selection
posted by  Paola Figueiredo  on 

We are dealing with this situation; Our future client wants to renovate (envelope modifications and HVAC renovationan) an existing building but he will not occupy the building; on the contrary he w

1
Wed Aug 22, 2012, 8:07 pm

Sealants on Stone Art wall

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jennifer Benedict  on 

We have a project where a large portion of the stone wall in the lobby will serve as an art installation (stone will be etched & then sealed).

1
Tue Jul 31, 2012, 5:41 pm

Baseline System parameters with a DES

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Luke Knapp  on 

I'm designing a building on a college campus that has a DES. We opted to model option 1 for EAc1 (Building Stand-alone scenario).

1
Tue Jul 31, 2012, 5:58 pm

Parking Capacity - Service/City Vehicles

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  MacKenzie King  on 

We are working on a city animal shelter that meets the zoning requirements for staff and guest parking on the site.

1
Wed Aug 1, 2012, 2:09 pm

choosing multiple baseline systems in one building

NC-2009 EAp2:Minimum Energy Performance
posted by  ESD Singapore  on 

Dear organisation, I have a question regarding choosing the correct baseline system. We are working on a Multipurpose building.

1
Wed Aug 1, 2012, 1:02 pm

Irrigation of greenery out of LEED boundary

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Anna Korinkova  on 

Hi all, our project does sub-meter water for irrigation.

1
Mon Sep 3, 2012, 2:17 pm

project footprint definiton

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  tanner white  on 

I have a building with 3 foot overhangs around it.

1
Thu Aug 30, 2012, 7:44 pm