Forum quick links
HVAC Design Case Equivalent of VRF systems
NC-2009 EAc1:Optimize Energy Performanceposted by Achelles DSouza on
I am working in an Office block project (conditioned area- 8500 sqft). VRF systems have been considered for it.
Printers in open space
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
If a project space does have printer areas in the open plan office but those printers/copiers are low-use, are there any additional details we need to provide or should we just mention these printe
Precertification
posted by IOANNIS LADOPOULOS on
good morning, I would like to ask a question with two sections. If a CS project has been precertified as platinum in a previous rating system (ie Version 2.0 ) : a) Can the final certification be
Split review - extend deadline?
posted by Tim Habraken on
Dear all, A quick question: I am working on a C&S project - aiming at a split review (construction phase & design phase).
Achieving this credit in a Shopping mall?
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We have a mall seeking LEED C&S 2009. Most of the spaces will be tenanted.
LEED v4 Healthcare - outpatient facility
posted by Sabrina B on
I am working on a project that is an OUTPATIENT free standing emergency department. It is not a HOSPITAL.
Community Connectivity travel distance
NC-2009 SSc2:Development Density and Community Connectivityposted by Jennifer Rennick on
I am documenting basic services within a 1/2 mile radius of a project, however within the radius is a large body of water (river port).
Employee Garden for IO Point?
EBOM-2009 IOc1:Innovation in Operationsposted by LUCY WILLIAMS on
Hi All, Has anyone had success crafting an innovation credit around an employee garden? We have a portion of our site dedicated to an organic employee garden.
Partial Existing Envelope
NC-2009 EAc1:Optimize Energy Performanceposted by Clint Whitney on
I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.
IEQ 4.4 and MR 7
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Al Shadid on
Can We have wooden doors that qualify for both IEQ 4.4 and MR 7? Can you have FSC wooden doors that contain no added urea formaldehyde?