Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Existing Transit

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Amanda Tullos  on 

Can someone please clarify, for infill projects under 125 acres with existing transit, does the project require access to multiple transit types? The credit language seems to request this.

1
Wed Mar 27, 2013, 2:40 pm

Responsible party for preparing M&V plan

NC-2009 EAc5:Measurement and Verification
posted by  Becky Dix  on 

What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?

1
Wed Apr 10, 2013, 2:34 pm

Can LEED interpretations be enforced on older LEED versions?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sandra Bauder  on 

It is my understanding, that though one can choose to quote a CIR for equal treatment under a specific credit, CIR's do not constitute a formal part of a credit requirement. Specifically, we are pu

1
Wed Mar 27, 2013, 7:46 pm

Controller efficiency factor (CE)

NC-2009 WEc1:Water Efficient Landscaping
posted by  Ricardo Sá  on 

During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).

0

ND standard vs the NC standard

ND-v2009 GIBp4:Construction activity pollution prevention
posted by  Amanda Tullos  on 

Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th

1
Thu Mar 28, 2013, 3:01 pm

Radical Simplification

General forums
posted by  Melissa Wrolstad  on 

MR credits need to be radically simplified. Below is an example simplification: "Combine MRcr2, MRc3 and MRcr4 into one credit.

0

Radical Simplification

General forums
posted by  Melissa Wrolstad  on 

MR credits need to be radically simplified. Below is an example simplification: "Combine MRcr2, MRc3 and MRcr4 into one credit.

0

Mini-split efficiency

NC-2009 EAp2:Minimum Energy Performance
posted by  Leandro Silva  on 

We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.

1
Mon Apr 1, 2013, 8:33 pm

Dedicated exhaust in areas of chemical storage- Janitor's closet

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  Karin Wohlert  on 

LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.

1
Thu Apr 4, 2013, 9:52 pm

LEED v2 and Mozilla

Living with LEED Online - quirks, bugs and hiccups
posted by  Melissa Wrolstad  on 

How come I can't use LEED Online v2 with Mozilla anymore?

0