No Cooling Tower ACP Feedback

Pilot-Credits WEpc94:No Cooling Tower
posted by     on 

I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are lar

1
Tue Jun 11, 2024, 10:45 pm

Commercial Kitchen Query

CI-v4 EAp2:Minimum energy performance
posted by  padma priya  on 

In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. 

2
Sustainability Project Manager
The Sheward Partnership
LEEDuser Premium Member
0 thumbs up
Mon Mar 25, 2024, 1:48 pm

Industrial Process Loads and the Exceptional Calulation Method

NC-2009 EAc1:Optimize Energy Performance
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use.

3
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Mon Mar 25, 2024, 5:39 am

Modeling only conditioned area

NC-v4 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 25, 2024, 5:38 am

Irrigation Establishment Period Flexibility / Regional Adjustments

NC-v4 WEp1:Outdoor water use reduction
posted by  Pooja Sannamani  on 

For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-year

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Mar 25, 2024, 1:28 am

Walk off mats for skyway entrance

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  SIG - Sustainability Main Account  on 

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "regularly used exterior entrance", thus require a walk off mat?

1
Fri Mar 22, 2024, 8:16 pm

Storage location

NC-v4 MRp1:Storage and collection of recyclables
posted by  Maiz Rech  on 

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

3
Vivá Consultoria
LEEDuser Basic Member
0 thumbs up
Fri Mar 22, 2024, 6:28 pm

Invite to share your experience on integrating passive design and sustainability into projects

Green Commons
posted by  Mike Fowler  on 

Please see the following invite from Professor Alexandra Rempel at the University of Oregon to participate a 15-20 minute phone/Zoom interview and share your experience and/or perceptions on t

0

IRA 179D and more

Green Commons
posted by  Simona Fischer  on 

A couple questions for this group. I know we're having a Green Commons meeting on this next week. But can anyone comment on the following questions?

22
Principal | Practice Lead
BranchPattern
LEEDuser Premium Member
6 thumbs up
Fri Mar 22, 2024, 4:10 pm

Buildings within site but not under LEED scope

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Marwa Elzoghby  on 

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope.

0