Forum quick links
Which MRT to use
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Jordan Kirrane on
Hi, I have the annual hourly mean radiant temperature results (from the energy model simulation). I'm wondering what MRT you have used in the past if you have all of these figures?
OA Air Flow Monitoring in Laundry
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Joe Kaminski on
The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.
Credit Specific requirements and Additional Questions mis-match
posted by Carolyn Day on
There seems to be a mis-match between the credit description and the requirements.
Probability distribution of annual PV production.
NC-2009 EAc2:On-Site Renewable Energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
Urban setting/city block difficulties
Pilot-Credits PC14:Walkable Streetsposted by Nicholas Bristow on
When completing this pilot credit, it seems that it should give more allowances for buildings that have streets on all four sides (take up an entire city block).
SSc3 and MRc2
Schools-2009 SSc3:Brownfield Redevelopmentposted by Robert Fiala on
We have a school project registered under LEED for Schools 2009.
Tint to Reduce Glare
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
We have a project that, after occupancy has taken place, would like to install a tinted film on some of the southern facing windows to reduce glare in work spaces.
Building use change during construction - how to proceed?
posted by Maria Papiez on
My team has just taken on a renovation/fit-out project. The building in which the project will take place is brand new, and is about 4 weeks from construction completion.
Single family homes - compliance with Energy Star and Checklists
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Mahesh M on
We are evaluating the possibility of pursuing LEED ND for a development in the middle east. The project consists predominantly of single family and low-rise residential units.
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.