Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Include or Exclude a classroom auditorium

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ashonta Langdon  on 

We are doing an addition to a classroom building on a college campus. A ~100 seat auditorium style classroom makes up about 25% of the regularly occupied space of the building.

1
Thu May 8, 2014, 8:27 pm

We have a resort project,

General forums
posted by  Eunju Park  on 

We have a resort project which has 4 buildings excluding villas in different phases. There are villas in the resort but we are intending to get LEED NC silver certification without villas.

0

Soil Materials, Site work costs contribute to total cost?

NC-2009 MRc4:Recycled Content
posted by  Matthew Martin  on 

Should I include loads of soil, stone, pipe bedding materials, underground pipe, catch basins or other site work materials to the total cost of materials?

1
Tue May 13, 2014, 4:34 pm

Qualifying spaces must meet IEQ c5

Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patients
posted by  yanghee pierce  on 

SS c9.2 says 'Qualifying spaces must meet the requirements for outdoor air quality enumerated in IEQ c5.’ Does this mean a project has to meet IEQ c5 in order to achieve SS c9.2?

1
Sat Dec 5, 2015, 7:17 pm

Building Metering and Utility Metering

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Becky Dix  on 

On a higher ed project, there is proposed metering of all energy and water usage for the LEED building that can be read from the building automation system.

1
Tue Mar 1, 2016, 8:28 pm

Eucalyptus as a renewable material

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Heather Appell  on 

We are working on a project that removed the existing invasive eucalyptus trees on site and used them towards the structure of the project.

1
Sun May 11, 2014, 2:09 am

LEED v4 and Pilot Credit Requirements

Pilot-Credits MRpc53:Responsible sourcing of raw materials
posted by  Chloe Bendistis  on 

I recently completed this Pilot Credit and determined that our project meets Option 1 and possibly meets Option 2.

0

Recycled content " Broadloom Carpet"

CI-2009 MRc4:Recycled Content
posted by  michael giannini  on 

The question i have pertains to the way information is placed on manufacturers websites and the validity of the information posted.

1
Sat May 10, 2014, 8:36 pm

International Projects Regional Credits

EBOM-v4 RPc1:Regional priority
posted by  Luis Huertas  on 

Anyone knows where I can get the list of the regional credits for international projects? I am evaluating a project in Aruba. Thanks.

1
Tue Mar 24, 2015, 3:56 pm

Resort in remote area

ND-v2009 PIf3:Project Location and Base Mapping
posted by  Racha Rachwan  on 

Dear all, i'm studying a large resort project that aims to be LEED certified under ND, the problem that here in Egypt the government encourage and support to have the resort area or new communitie

1
Mon May 12, 2014, 2:59 pm