Calculating Hazardous Glass Area

Pilot-Credits SSpc55:Bird collision deterrence
posted by  ray keane  on 

How is the Hazardous Glass Area (HGA) calculated for each material? Is a material with a higher threat factor weighted the same as a material with a lower threat factor?

0

Existing Envelope for LEED v3

NC-2009 EAc1:Optimize Energy Performance
posted by  Ken Pilcher  on 

Any help regarding the reuse of an existing building LEED simulation would be helpful. We are working on an existing building that was a warehouse and is now an office building.

1
Sun Mar 23, 2014, 8:07 pm

run off coefficient

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jin Park  on 

Hi My project site is composed of sand,gravel. How do I define the run off coefficient? Where can I get it? I'm not experienced enough to work LEED project. Might be a poor question..sorry.

1
Fri Mar 21, 2014, 12:19 pm

Credit Template Troubles

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Glen LeComte  on 

I am filling out the pre-requisite template for our LEED 2009 CI project. There are only 2 Break Room Sinks for the project.

1
Sat Jul 26, 2014, 5:20 am

Confused by Third Party reporting tequirement of Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Renee Shirey  on 

I would love some insight on why, if going for Option 3, the whole-building water and energy usage data reporting MUST be done by a Third Party Data Source, vs. the actual Owner?

1
Sun Mar 23, 2014, 8:13 pm

Steel coils counted as recovered/extracted?

NC-2009 MRc5:Regional Materials
posted by  Jennifer Ratts  on 

Are steel coils counted as recovered for this credit? I have several products where steel coils are used. Does this count?

1
Fri Mar 21, 2014, 9:51 pm

New DES commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Shevaun Barrie  on 

Hi, We are commissioning a building that will be connected to a DES that was completed in 2012, so it is considered "new".

1
Tue Mar 25, 2014, 7:53 pm

Natural System Instead of Public Sewer.

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  JOSE R. TAGLE  on 

Hi everyone! We are working on previously undeveloped land project, which apply for case 1 “site with existing imperviousness 50% or less”.

1
Fri Jul 25, 2014, 5:11 am

No irrigation, No landscape - option 2 compliance

NC-2009 WEc1:Water Efficient Landscaping
posted by  Nicole Kimoto  on 

I'm working on a project where the existing site is 100% concrete paving. We are not providing any landscape, thus no irrigation. Does this mean we comply with option 2?

1
Sat Mar 22, 2014, 2:05 pm

RockWool MR6

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Al Shadid  on 

Is rockwool considered a rapidly renewable material? I understand that rapidly renewable materials must be made from either plants or animals and must have a harvest cycle of 10 years or less.

1
Sun May 11, 2014, 2:10 am