Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

construction site facilities outside of LEED project boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Doreen Kruschina  on 

Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.

1
Tue Feb 11, 2014, 1:08 pm

LEED EB O&M Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sathish Kumar  on 

There are 3 buildings in a single site and these 3 buildings have a shared basement parking.

1
Mon Feb 24, 2014, 3:04 pm

LEED CS VS LEED NC

LEED Rating System Selection
posted by  Javier Garcia Jones  on 

Hi, I'm working in major renovation on an office project that is going to be lease out once it's finnished. Project scope includes initial tenant fit out (HVAC, lignting, ceilings,etc). Which rati

1
Sat Mar 8, 2014, 2:47 am

high - rise residential building??

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Davide Filippi  on 

From the supplemental Guidance resion 2: "LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high - rise resi

1
Tue Feb 11, 2014, 9:54 pm

Stand Alone Building or Campus?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Jennifer Sutherby  on 

Hi All, I am attempting the ITE study for a research building with below ground parking located on a hospital campus.

1
Tue Feb 18, 2014, 2:22 pm

Fire station fixture uses

NC-2009 WEc3:Water Use Reduction
posted by  Mary Lea Tucker  on 

Would back of house (non public) fixtures in a fire station be considered residential fixtures?

1
Fri Mar 7, 2014, 10:12 pm

outdoor air rate in area where uses demand control strategy

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.

1
Wed Feb 12, 2014, 2:08 pm

Exterior covered spaces

Schools-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Esmeralda Ward  on 

Hello, Could someone please clarify where exterior hardscape spaces that are covered by the building roof should be counted?

1
Wed Nov 25, 2015, 2:36 am

Renovate an old school

Schools-EBOM-v4 MPR3:Must comply with project size requirements
posted by  Davide Filippi  on 

I'm working to certify a school in LEED EB:OM v4.

0

after the first review,change the energy modeling softare.

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir, some problem occured to our project when we made the second submission. We have to change the energy modeling softare and remodel. Is it ok?

1
Wed Feb 12, 2014, 2:16 pm