Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.
LEED EB O&M Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sathish Kumar on
There are 3 buildings in a single site and these 3 buildings have a shared basement parking.
LEED CS VS LEED NC
posted by Javier Garcia Jones on
Hi, I'm working in major renovation on an office project that is going to be lease out once it's finnished. Project scope includes initial tenant fit out (HVAC, lignting, ceilings,etc). Which rati
high - rise residential building??
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Davide Filippi on
From the supplemental Guidance resion 2: "LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high - rise resi
Stand Alone Building or Campus?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jennifer Sutherby on
Hi All, I am attempting the ITE study for a research building with below ground parking located on a hospital campus.
Fire station fixture uses
NC-2009 WEc3:Water Use Reductionposted by Mary Lea Tucker on
Would back of house (non public) fixtures in a fire station be considered residential fixtures?
outdoor air rate in area where uses demand control strategy
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.
Exterior covered spaces
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Esmeralda Ward on
Hello, Could someone please clarify where exterior hardscape spaces that are covered by the building roof should be counted?
Renovate an old school
Schools-EBOM-v4 MPR3:Must comply with project size requirementsposted by Davide Filippi on
I'm working to certify a school in LEED EB:OM v4.
after the first review,change the energy modeling softare.
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, some problem occured to our project when we made the second submission. We have to change the energy modeling softare and remodel. Is it ok?