Heat pump dehumidifier minimum efficiency requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Can anyone please clarify which, if any, minimum efficiency requirements are set for heat-pump dehumidifiers (indoor swimming pool dehumidifiers) under ASHRAE 90.1 (2007)?
Design Review Appeal or Construction Review?
posted by Keith Barnes on
We have been denied two prerequisites from the Design Phase (EAp2 and IEQp1) after the final design review. The project will be substantially complete in a month and a half.
Core Performance Compliance New Air-handler- Existing Chiller
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Tom Nichols on
If we specify a new air handler that uses steam and chilled water from existing systems, do these systems need to comply with the CPG efficiency requirements?
SSc6.2 Civil Engineer's comment
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Sheryl Swartzle on
The civil engineer on our project made the following comment : "Item 6.2, quality control: all exfiltration trenches accepting rainwater discharge are "dry" and that is considered as pretreatment
Alternative Transportation Education Option 7
Retail-NC-v2009 SSc4:Alternative transportationposted by Alfred Servodidio on
As defined in the handbook-Provide an accessible board or computer display in the retail area for both employees and customers that provides transportation information.
Are MERV equivalent filters for international projects accepted?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Jenelle Shapiro on
Hello - I'm working on a project in Japan, and the MERV rating system is not used here.
Deciding to choose Option 1(D) or Option 2(B)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by James Keohane on
I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.
VAV System with Reheat
NC-2009 EAc5:Measurement and Verificationposted by Maya Karkour on
Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi
Building Envelope Commissioning
Healthcare-v2009 EAc3:Enhanced commissioningposted by Kerrie Racicot on
BECx can be wide open when it comes to scope. Is there some guidance regarding the scope that LEED is looking for? Thank you,
Assuring that reviewer holds us to v2 requirements
posted by caitlin sweeney on
I am about to submit one of our projects for review under v2 version.