Healthcare-v2009 IEQp3:Hazardous material removal or encapsulation (renovations only)posted by Marina Andrade on
Our Project is suffering a retrofit in a abandoned building, and doesn't have any occupant since the 70's.
Accounting for common/shared areas
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Accounting for common/shared areas
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Buildings Attached to non LEED-certified buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Zachary Mathern on
I am referring to the Supplemental Guidance to the MPR's; All Attached Buildings, 2) Treating Energy Systems.
Uploaded drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Beattie on
I've been waiting to upload the drawings for our project until the revisions generated by Owner and Contractor have been complete, and the drawings reflect what's actually being constructed.
Surface Water Management Credits
posted by Eva Pong on
(Credit 4.1 states: 'Design the lot such that at least 70% of the buildable land; not including area under roof, is permeable or designed to capture water runoff for infiltration on site.' ) Is the
School as a Teaching Tool vs ID Green Building Education Program
Schools-2009 IDc3:The School as a Teaching Toolposted by Rebecca Molldrem on
Since ID Credit 3 is an option under LEED for Schools, does this mean that if a project is not pursuing this, they also wouldn't be able to pursue an Innovation in Design credit for a Green Buildin
Calculating parking area
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Sean Hogan on
I have a project seeking certification which has approximately 750 surface car parking spaces.
Complete information on Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
There are no pumps or VAV fans on this project which are 5hp or greater.
Energy modeling review question
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
For a LEED project that recently received the preliminary design review comments, we were asked to analyze and correct the documentation to comply with pre-requisite EAp2.