Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pedestrian Walkway

NC-2009 PIf2:Project Summary Details
posted by  Ashley Sadowski  on 

Hello, We are adding a pedestrian crosswalk to connect the building to the opposite side of the street. This was not required and are hoping to achieve an ID point for including it.

1
Tue Jul 2, 2013, 8:25 pm

Average rainfall is sufficient for irrigation

CS-2009 WEc1:Water Efficient Landscaping
posted by  Ron Dean  on 

We have a project in Medellin, Colombia. The project has large areas of vegetation. In the driest month (January), it rains in average 12 of the 31 days.

1
Mon Nov 4, 2013, 6:54 pm

Document ALL items?

NC-2009 MRc7:Certified Wood
posted by  Jamie Abernethy  on 

If I take the default 45% of contract price for divisions 3-10 just in the concrete and steel my totals are 80% plus for recycled content and regional materials.

0

Recertification

CI-2009 PIf5:Previously LEED Certified Details
posted by  David Wood  on 

I had one more question about recertification.

1
Tue Nov 5, 2013, 5:24 pm

WEpc10 through use of cistern

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Joanna Switzer  on 

Hello, Latest one of my projects pursuing this pilot credit is a daycare facility. Adult toilets are low flow, but child sized toilets are standard 1.6gpf.

0

Major Advancement in Energy Performance

General forums
posted by  Scott Bowman  on 

I have also voted as a qualified YES.

0

Allocated Parking Space but Need to Pay

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  SW LEE  on 

Hi , We wish to attempt case 1, option 2, no subsidy. In the tenant contract, it mention, the building owner will allocate 17nos of parking space which each parking space will cost the tenant USD

1
Mon Nov 4, 2013, 4:32 pm

Street trees

Pilot-Credits PC14:Walkable Streets
posted by  Florian Schmidtchen  on 

How is distance between street trees measured? From center to center or from the border of the crown to the next crown border?

0

Operable Windows Complaint Area

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Gurneet Singh  on 

As per the requirement operable window can be counted as control for all the occupants occupants located within 20 feet of the exterior wall and within 10 feet of either side of the operable part o

1
Tue Jun 25, 2013, 4:49 pm

New Campus Tool

LEED Guidance for Campuses and Multiple Buildings
posted by  Brian Leet  on 

I am having a great deal of trouble finding any indication of how the campus side of the new site works. (For that matter, it took some scouring to even find the new site.

1
Thu Jun 27, 2013, 11:54 am