Gray area of commingled vs on-site sorting
NC-2009 MRc2:Construction Waste Managementposted by Stantec IP - Dupe - Do not use on
During a demo of an existing building, many items were sorted onsite and sent to a specific recycler.
Connection to Project Boundary
ND-v2009 NPDp3:Connected and open communityposted by Bernard Sagaiyaraj on
This is relating to NPDp3 and NPDc6. I have a project with 4 motorized street connections to the project boundary and 2 pedestrian walkways (stairways) to the project boundary.
Parking Garage & Office/Hangar Buildings
posted by S D on
We have two projects on one site, a parking garage (not a LEED project) and an Office/Hangar which will be submitted for LEED certification (registered under v2.2).
Old refrigeration equipments in new construction.
NC-2009 EAc4:Enhanced Refrigerant Managementposted by James Chueh on
Hi all, The project we are working on will have old refrigeration equipments moved from other place.
Basic service in community connectivity
CI-2009 SSc2:Development Density and Community Connectivityposted by soha yamani on
i have a commercial interior building that lies in an office park with a lot of landscaped areas , can this be considered as the park as one of the 10 basic services surrounding the building ? als
PBT Source Reduction - No Circular Fluorescent Lamps?
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Rosemary Ziemann on
Does anyone know the reasoning / sustainability behind not specifying circular fluorescent lamps? For LEED HC MR4.1 PBT Source Reduction - Mercury in Lamps, it says Do not specify them. Thanks!
ASHRAE 90.1- section 6 Mandatory requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Chinthaka Jagodaarachchi on
ASHRAE 90.1 -2007 has following clause. 6.4.3.9 Ventilation Controls for High-Occupancy Areas.
Submittal Exchange and IDc1
NC-2009 IDc1:Innovation in Designposted by Keelan Kaiser on
For any of you familiar with the Submittal Exchange product, can anyone verify whether it is possible to pull down an IDc1 for this integrated submittal review process?
Existing LEED project boundary and new site work
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Robertson on
I need some input. I have a project with an existing LEED boundary. The client did some site work - hardscaping and landscaping within the boundary after our project was occupied.
Are Science Classrooms with no fume hood exempt?
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rebecca Grant on
We have science classrooms in a new middle school. The science classrooms do not have fume hoods because no hazardous chemicals are used in these classrooms.