NC-2009 EAp2:Minimum Energy Performanceposted by le sang on
I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process loa
Vacant Space Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Calloway on
I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.
WE Pr 1 lavatory faucet durations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rebecca Molldrem on
Our reviewer has noted in the technical advice that "for projects registered after Feb 2, 2011, a 30 second duration is required for lavatory faucets." We have used either 15 seconds, or 12 second
Contaimination found,but remediation not required per site class
NC-2009 SSc3:Brownfield Redevelopmentposted by Erin Holdenried on
I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so
Flush & Flow Fixture Installations
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexis Voeltner on
If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are a
Athletic Field included under SSc5.2, but excluded under WEc1?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Lisa Milano on
There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.
Testing Approach
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by J.R. Anderson on
I have a middle school slated to be completed this coming summer. It will be in late July. Each classroom has a dedicated ground source heat pump air handling unit.
About the "You may get dirty" factor in SSc6
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Jun MA on
I've been reading the EB&OM stress test, and felt confused about the "You may get dirty" factor in SSc6.
Calculating Building Occupants for a MURB
posted by Erin Norton on
I'm second guessing myself and I'm hoping someone can offer some clarity. I'm trying to calculate the number of Building Occupants for an apartment building.
Minimum implementation of sanitary fixtures
CS-2009 WEp1:Water Use Reductionposted by PAULA HIDALGO on
Is there a minimum implementation of sanitary fixtures?