I am relatively new to LEED

NC-2009 EAp2:Minimum Energy Performance
posted by  le sang  on 

I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process loa

1
Thu Feb 21, 2013, 3:05 pm

Vacant Space Critical Zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Calloway  on 

I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.

1
Wed Feb 20, 2013, 6:54 pm

WE Pr 1 lavatory faucet durations

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rebecca Molldrem  on 

Our reviewer has noted in the technical advice that "for projects registered after Feb 2, 2011, a 30 second duration is required for lavatory faucets." We have used either 15 seconds, or 12 second

1
Wed Feb 20, 2013, 5:23 pm

Contaimination found,but remediation not required per site class

NC-2009 SSc3:Brownfield Redevelopment
posted by  Erin Holdenried  on 

I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so

1
Wed Feb 20, 2013, 5:54 pm

Flush & Flow Fixture Installations

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Alexis Voeltner  on 

If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are a

1
Thu Feb 21, 2013, 4:39 pm

Athletic Field included under SSc5.2, but excluded under WEc1?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Lisa Milano  on 

There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.

1
Fri Feb 22, 2013, 10:44 pm

Testing Approach

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  J.R. Anderson  on 

I have a middle school slated to be completed this coming summer. It will be in late July. Each classroom has a dedicated ground source heat pump air handling unit.

1
Wed Mar 20, 2013, 11:47 pm

About the "You may get dirty" factor in SSc6

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Jun MA  on 

I've been reading the EB&OM stress test, and felt confused about the "You may get dirty" factor in SSc6.

1
Thu Feb 21, 2013, 2:43 am

Calculating Building Occupants for a MURB

Calculating FTEs
posted by  Erin Norton  on 

I'm second guessing myself and I'm hoping someone can offer some clarity. I'm trying to calculate the number of Building Occupants for an apartment building.

1
Thu Mar 21, 2013, 5:18 pm

Minimum implementation of sanitary fixtures

CS-2009 WEp1:Water Use Reduction
posted by  PAULA HIDALGO  on 

Is there a minimum implementation of sanitary fixtures?

1
Fri Mar 22, 2013, 5:21 am