Forum quick links
Thermal Zones
Healthcare-v2009 EAp2:Minimum energy performanceposted by Attiq Rahman on
I am modeling an office building for LEED which will house different tenants that will consists of a dental clinic and medical clinic etc. There are a number of different spaces in the building.
Single ply roof membrane
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
In a greenroof application, if a single ply roof is use (we called it a "liner"), does it have to comply with the 450 g/L of VOC limit? Techically, it is on top of the building on the outside.
System fan power - Baseline - Continuation
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi Marcus, I don't know what happened in the discussion "System fan power - Baseline". I can't post anymore... In my software, I give as an input the baseline design supply fan airflow rate.
Locally produced foods
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Tiffany Moore on
I have two examples of foods that meet the intent of this credit, but don't fit fully into the 100 mile limit.
Option 2: EV Capacity per Station
posted by Richard Manning on
The LEED Credit Form asks for the capacity per charging station.
the next step in ergonomic excellence
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Joanna Paull on
I just wanted to check in with all you bright folks about strategies that are on the up and up.
Open space have to be acessible?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Marcio Alberto Casado Pereira on
We have a big area vegetated with adaptaded species within the LEED Campus Boundary (we have a multiple building situation) that does meet the 1:4 side slope criteria but it is unlikely that the bu
Scored High in Prerequisite
EBOM-2009 EAc1:Optimize Energy Performanceposted by Ryan Gardner on
Hello, my project recieved an Energy Star rating of 95 in the prerequisite stage. We have not identified any cost effetive ways to improve this number.
Access Panel in Hard Lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ralph Bicknese on
Our janitor rooms do not have deck-to deck partitions.
Preferred parking spaces
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Emmanuel Pauwels on
We are certifying a tenant space with LEED CI in a building that was previously CS certified. The CS building has preferred parking spaces for electrical vehicles.