easily feasible for DoD projects
Pilot-Credits WEpc153:Water Leak Detection and Monitoringposted by Alison Kerr on
Since building monitoring systems are already requied this is a low-cost Pilot credit that ties easily into most deisgns.
Name incorrect, and usefulness for USACE in-house design
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Alison Kerr on
IPpc90 in LEED Online, v4, BD+C is "Social equity within the project team." Not "...the operations and maintenance staff." My comment is regarding the Project Team Pilot credit.
"with errata but without addenda"
NC-v4 EAp2:Minimum energy performanceposted by Alfonzo Collins on
The LEED v3 reference book already refers to ASHRAE 90.1 "with errata but without addenda." The v4 book only says "with errata." Does that imply that all addenda to ASHRAE 90.1 must be
Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)
CS-v4.1 SSc4:Rainwater Managementposted by Ammar Yahia on
As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area.
Best replicating natural site hydrology processes
NC-v4.1 SSc4:Rainwater Managementposted by Allen Cornett on
If the rainwater that is captured and used for flush fixtures meets the percentile thresholds can this credit be successfully attemtped? If the rainwater is used for the flush fixtures it wou
Single LEED building in Zoo: Demand Response Plan required for entire Zoo?
NC-v4 EAc4:Demand responseposted by Joyce Kelly on
Wondering if the Demand Response Plan needs to address the entire Zoo the way Parking, Green Vehicles credits must.
Energy Modelling Software
NC-v4 EAp2:Minimum energy performanceposted by Eliane Krugman on
Hi everyone,
I'm wondering what is the most common software for energy modelling ASHRAE 90.1
Existing Building or Commercial interior?
posted by Ammar Yahia on
We have an existing 45 Storey building consist of 2 basements, ground, two mezzanine, and 40 floors.
Energy Star Commercial Washer
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Michael Mantai on
We have a project that includes commercial washers. The basis of design is a top load light commercial washer. From the Energy Star website, a top load commercial washer is not eligible
Select Different Options for Multi-Tenant Buildings?
EBOM-v4.1 MRc1:Purchasingposted by Kristina K on
Hello,
Can different options be selected under this credit if there are multiple tenants in the building?