Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

infill site

ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodies
posted by  Cardy V  on 

Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?

0

LEED Project Boundary for a Train Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michael G  on 

Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati

1
Tue Nov 5, 2013, 4:43 pm

When to submit for construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jon Quigley  on 

Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?

1
Tue May 28, 2013, 12:31 pm

Airflow Monitoring Devices Specifications

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ahmed Younis  on 

Does the (airflow sensor) need to have any specifications other than the required accuracy (which is 15%) which was mentioned in the study guide?

1
Mon May 27, 2013, 4:25 pm

water use reduction calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  Jamal Uddin  on 

How to calculate the baseline building performance with compare to my building performance in water use reduction?

1
Mon Aug 19, 2013, 6:29 pm

LEED Project Boundary of vertical attached building

NC-2009 PIf2:Project Summary Details
posted by  Nan ZHANG  on 

Dear all, I'm working on a vertical attached building project.

1
Fri May 31, 2013, 8:44 pm

Denied Design Credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Karim Farid  on 

If a Design credit was denied in the Final Design review, can I resubmit it with the Construction credit after addind the missing information

1
Mon May 27, 2013, 7:00 pm

Tenant Submetering

CI-2009 EAc3:Measurement and Verification
posted by  sompoche sirichote  on 

I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora

1
Tue May 28, 2013, 2:34 pm

Cooling EIR as the only evidence of PFan modeled separately?

NC-2009 EAp2:Minimum Energy Performance
posted by  Ting Wang  on 

We received an comment review about a system 6 (PVAV w/ PFP boxes) baseline model in eQuest: The SV-A reports indicates that the cooling efficiencies for the HVAC systems were not correctly reflect

1
Tue Jun 4, 2013, 2:06 pm

Direct grid feed in - eligible?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jens Apel  on 

After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic

1
Tue May 28, 2013, 2:46 pm