NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Tim Setala on
We have a project where infiltration is not possible as the soils are D type.
Chiller
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
Should the chiller be considered part of the commisioning and M&V metering even if it's serving other tenants as well?
Chiller
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
Does a chiller have to be considered in commisioning even if the chiller is serving other tenants as well?
Divisions
CI-2009 MRc4:Recycled Contentposted by Mike D on
Where can I find the list of Divisions stating which materials are under which Divisions? thanks!
Single possibly non-compliant adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Eric Thompson on
I'm working on a project in Norway and it is very difficult to get information from the contractor who is resistant to cooperation. It appears that one of the adhesive products is non-compliant, t
LEED® Certification Agreement
posted by Albert Sagrera on
Once finalized the justification of credits, and uploaded the information to begin the process of Design Preliminary Review, in the section Overview, we get this message: " Your selections do not m
HERS equivalency in international context
ND-v2009 GIBc2:Building energy efficiencyposted by Daniel Costantino on
Hello: are there any recommended approaches for equivalency with HERS ratings in international contexts? Thank you, Daniel
MRc5 Calculator Question
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
My project is going for Option 1 of the MRc5 credit.
Zero Lot Line Development
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Ralf Lehmann on
If the project has no outside facilities, is the credit still available? For example I have dove defense on the roof. Thank you!
Regional Credits in Canada?
Healthcare-v2009 RPc1:Regional priorityposted by Ed Clark on
Hi, I am curious as to how to assess regional priority credits for a project in Vancouver, BC. Thanks, Ed Clark