Forum quick links
Low Flow Kitchen Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jay Murray on
We are renovating and entire floor (43,000 office space square feet).
Non-structural wall resurfacing
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by James Ketter on
Our project has existing non-structural plaster walls that will be reused in place.
Removal % in LEED reference guide table.
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Emmanuel Pauwels on
If I understand correclty, we can use the table in the reference guide with several BMPs to determine the removal efficiency.
GIB prereq 4 for projects registered during stage 2
posted by Jutta Berns on
we have a LEED ND project in South Africa, which we registered early this year at Stage 2.
Dance studio views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Norma Lehman on
this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky.
Narrative on Data Collection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Xun Jia on
Can anyone help with the text box asking for a description of the data collection methodology etc.? We are using option 3. The survey went out to everyone and we got 66% participation.
Define "no new parking" - project site is a former parking lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jill Ziegler on
My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only.
Occupant diversity
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
Im working on a C&S building and we have two space types: office and meting rooms. I would like to know if I can use occupant diversity (D) for the outdoor air calculations.
Electric Rates
Schools-2009 EAc1:Optimize Energy Performanceposted by Laura Long on
The electric company for our school project offers a rate structure which includes a lower rate for heat pumps.
Unnecessary Permanent Irrigation
Schools-2009 WEc1:Water Efficient Landscapingposted by Tim Hoeft on
Our landscape designer has assured us that the native plant design will not require irrigation once established.