Forum quick links
Underground LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Luis Miguel Diazgranados on
Greetings I'm working on an office project with underground parking. There is a LEED boundary which has been drawn for the street level, but the underground parking goes beyond this boundary.
10' mat requirement with revolving door
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Jean Savitsky on
We have a building where there is a revolving door flanked by two hinge doors.
Space by Space method
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Tejaswi Damaraju on
Hello, I am working for a Retail-commercial interiors project with less than 5000 Sq feet of space.
Energy Cost Budget Method
CI-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, we have just certified a building as Core and Shell, but now the owners want to achieve also the Commercial Interior certification.
Thin Client
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.
Conditioned Space
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Consider a space, storage, with no heating, modelled with heating setpoint -50 degC, receives air from a central air handling unit VAV system, where the delivered air is pre-conditioned from Outdoo
Already certified project
posted by soha yamani on
i have a certified project under NC v 2009 it was registered on 5/30/2010 the certified project consist of 1- a building that consist of a ware house zone labour zone and administration zone
Flushout of Nonoccupied Spaces
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sally Marr on
The 26,000 square foot building that I am working on has several spaces that are not served with supply air by the building's ventilation system, including toilet rooms and mechanical and electrica
Anticipated Review Return Date Question
posted by Kathy Wislocky on
I haven't submitted for review in a very long time. Could someone confirm if the "anticipated return date" after my preliminary review is a hard date or just a recommendation?
green energy contract for another building of the same company
CI-2009 EAc4:Green Powerposted by Adam Targowski on
It turned out that the buidling where our client's office is located has a contract signed with an energy provider that doesn't provide green energy.