Forum quick links
sight line angle?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Carrie Laurendine on
Hello, im documenting this credit for the firs time ever, and little confused over something.
Does GreenPro (TM) meet LEED standard?
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Jennifer de Mooy on
I am trying to determine if the GreenPro (TM) certification through NMPA meets the LEED requirements.
IEQ Pr1 & c2 - work code in France in place of ASHRAE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nicolas MOLLE on
Hello, IEQ-p1: Work code is more stringent than ASHRAE, so we'll use work code air rate to justify prerequisite The question is: we want to obtain the IEQ-C2 increasing by 30% the air rate BUT o
percentage versus actual TSS number
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Adrienn Gelesz on
Hi! Does anyone know how to convert remaining g/l data into percentage data?
NC project schedule overlap with EBOM performance period?
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Tiffany Moore on
I'm working with a project team that had planned to certify their facility under NC and follow immediately with a performance period for EBOM certification.
tenant compliance required?
EBOM-2009 MRp2:Solid Waste Management Policyposted by Jill Ziegler on
Can anyone elaborate on the following credit language?
Help with a new study of green water technologies!
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Pyke on
The Water Research Foundation and Virginia Tech have partnered for a study on the unanticipated consequences of green water technologies and practices on water use in buildings.
Permeable areas
EBOM-2009 WEc3:Water Efficient Landscapingposted by Lourdes Salinas on
I'm curious on what everyone thinks about permeable areas covered with gravel; are these considered landscape areas and account for the 5% landscape area requirement?
FIre Station Apparatus Bay
NC-2009 IEQp1:Minimum IAQ Performanceposted by Chris Mullinax on
I'm working on a FIre Station with a 7500 sq. ft. apparatus bay. The bay is approximately 75' X 100' with (3) 195 sq. ft. doors on each of the long ends (6 doors total). Ceiling Height is 20'.
The Correct Limit of VOC to Use
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
Good morning friends, I would like to understand how to use the table SCAQMD Rule 1113 to know the VOC limit in any material in general, and in floor coating specifically.