Completing EAp3 Form Without Equipment Information

CS-2009 EAp3:Fundamental Refrigerant Management
posted by  Tony Schafer  on 

I am having trouble completing the EAp3 form. Since there won't be any cooling equipment installed as part of this C&S project, there is nothing to fill out in table L-2.

1
Fri Aug 24, 2012, 2:22 pm

Completing WEp1 Form Without Fixtures Specified

CS-2009 WEp1:Water Use Reduction
posted by  Tony Schafer  on 

I am having trouble completing the WEp1 form. Since there won't be any fixtures installed as part of this C&S project, there is no fixture schedule to upload.

1
Fri Aug 24, 2012, 2:43 pm

IEQp1 ASHRAE Section 4 through 7

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Diana Hill  on 

We are working on a office interior design project.

1
Fri Aug 31, 2012, 5:38 pm

Tenant Submetering connected to BMS?

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Marco Abdallah  on 

We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.

1
Fri Aug 24, 2012, 12:58 pm

Pond use outside LEED boundary

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Brian Wolfe  on 

Is it acceptable to utilize an existing detention pond that is outside the proposed LEED boundary? The stormwater runoff will be piped under the existing road to the pond.

1
Sun Aug 26, 2012, 8:47 pm

Lighting measurement

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m

1
Mon Aug 27, 2012, 2:18 pm

Time Effort required for LEED ND Consultancy

General forums
posted by  Mario S.  on 

Hello everyone, I am curious to know the following: Based on your experience dealing with large projects applying for LEED ND Certification, what would you say is the time effort per stage require

1
Mon Sep 3, 2012, 5:07 pm

Green roof claimed through tenant lease?

CS-2009 WEc1:Water Efficient Landscaping
posted by  Dan LeBlanc  on 

Anyone know if a green roof with compliant irrigation systems can be required in a tenant lease to claim at least 5% of site area to achieve this credit?

1
Thu Aug 30, 2012, 5:44 pm

Anyone tried using Wegowise for this?

Pilot-Credits PC38:Advanced Utility Tracking
posted by  Nadav Malin  on 

I just saw the announcement that Wegowise is offering a one-year trial to LfH certified projects. Has anyone tried it? https://usgbc.wegowise.com/

0

What is "flooring?"

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Michael Smithing  on 

The space our CI project will be occupying currently has a raised floor installed throughout.

1
Fri Aug 31, 2012, 2:21 pm