Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Laminating Adhesives

CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Joseph Greene  on 

Hoping for some collective wisdom. Construction Preliminary Review comments requested specific information on laminating adhesives for products listed in this credit.

1
Fri Aug 10, 2012, 7:02 pm

high efficiency motors

CS-2009 EAc3:Enhanced Commissioning
posted by  Afonso Cardoso  on 

I would like to know if high efficiency motor's verification is part of fundamental commissioning or even enhanced commissioning? If don't, where does it fit? Which credit?

1
Fri Aug 31, 2012, 1:50 pm

Specialty coatings: Dry erase paint

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Tiffany Moore  on 

I am evaluating a non-flat coating used to "paint" on a dry erase surface for a training room.

1
Mon Aug 13, 2012, 4:45 pm

Administrative Wing of Industrial Facility

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Lorena Moscoso  on 

Dear all: There is an administrative wing of an industrial facility and my questions are: 1.

1
Mon Aug 13, 2012, 1:16 pm

Should I include demolition debris?

CS-2009 MRc2:Construction Waste Management
posted by  Sandra Holmström  on 

I wonder if I need to include demolition debris if a former building at the project site was demolished for four years ago?

1
Mon Aug 13, 2012, 4:00 pm

Irrigation - Project Boundary

CI-2009 SSc1:Site Selection
posted by  Alicia Freire  on 

Hi, I am working on a building located in a development in a business park with 4 buildings.

1
Thu Aug 30, 2012, 5:17 pm

IEQ 4 - Group 5, 1168 and SCM discrepancies

LEED for Healthcare forum
posted by  Bruce Maine  on 

IEQ 4, Group 5 references both 1168 and the ARB SCM. However, not all references are equal. 1168 identifies non-Flats as 50 g/L and the SCM identifies non-Flats as 100 g/L.

0

"Other" in Target Finder

NC-2009 EAp2:Minimum Energy Performance
posted by  Maura Adams  on 

I'm working on a science building on a prep school campus with a lot of lab space. It was entered as a school into Target Finder, but obviously compares poorly to regular school buildings.

1
Mon Aug 13, 2012, 5:45 pm

Small Adaptive Reuse/Urban Church

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Keelan Kaiser  on 

In a situtation where the buidling is nearly to the lot lines in all four directions and the zoning requires 37 parking spaces, we would need to provide 2 LE/FE stalls under option 1.

1
Fri Aug 31, 2012, 9:34 pm

Adaptive Reuse/Urban Church

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Keelan Kaiser  on 

In the case of a building that is nearly built to lot lines in all directions except the alley, can the secure bike racks be located on the alley side of the building and meet this credit requireme

1
Wed Aug 22, 2012, 7:07 pm