Forum quick links
Appeals
NC-2009 EAp2:Minimum Energy Performanceposted by J Morrison on
I have been told by our very reputable Design firm that is is not unusual to have two design appeals on the EA credit 1 and prerequisites.
IEQp3 Entryway Systems
EBOM-2009 IEQp3:Green Cleaning Policyposted by Maria Vasapollo on
Does anyone know if the 10ft long entryway mats can be split into two mats?
Durable Goods Purchase
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Janna Nash on
Could someone tell me if this would apply as a Durable Good purchase?
Impervious Area
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Greengrade User on
Am I correct in assuming that even though our total impervious area on the site will increase, we can achieve this credit by implementing treatment strategies that capture 90% of the storm water ru
I recently stumbled upon a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Chloe Bendistis on
I recently stumbled upon a strange requirement for aerosol adhesives in the IEQ c4.1 credit form v2009 that is NOT listed in the addenda.
Addressing playing fields at a school in SSc2 & SSc3
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Jessica Hawley on
Our client is a school with multiple playing fields on the project site.
partial renovation / partial expansion EAc1 points
CS-2009 EAc1:Optimize Energy Performanceposted by Katherine Ann Resurreccion on
We've learned that for projects with partial renovation and partial expansion a new points thresholds should be calculated for EAc1.
Site Selection - Historic Landmark
NC-2009 SSc1:Site Selectionposted by David Cloutier on
Question: If you performing a Major Renovations with no addition to an existing Historic Building in a Historic Landmark and the project requires minimal new parking spaces and new walkways and the
Window U factor
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
Can you use center of glass for EAp2 & c1 or do you need factor for the entire unit?
AGMBC - EBOM Group Project
posted by Mark Zoeteman on
AGMBC indicates that for O&M projects, all buildings must have space types that are substantially similar.