Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

wood

CI-2009 MRc2:Construction Waste Management
posted by  Juliana Malho  on 

Whern you burn a wood that was diverted from landfills, is it considered recycling??

1
Tue Jun 12, 2012, 2:22 pm

Laminating Adhesive proof of no UF

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Laura Charlier  on 

We submitted an MSDS as proof of no urea-formaldehyde in a laminating adhesive and got this response from the reviewer: An MSDS that does not list urea-fomaldehyde is not confirmation that the pro

1
Thu Apr 12, 2012, 8:09 pm

This classification confuses to me

Pilot-Credits EApc67:Energy Jumpstart
posted by  Bill Swanson  on 

I'm not understanding why this is a Pilot Credit. Per USGBC's website. "What is the Pilot Credit Library and its purpose? a.

0

Eggshell

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Fernanda Cortes  on 

If a paint contains in its composition grams of mashed eggshell, is this component considered a rapidly renewable content ?

1
Thu Apr 12, 2012, 7:44 pm

Architect Signatory

NC-2009 EAp2:Minimum Energy Performance
posted by  Christopher Getz  on 

Does the Architect Signatory have to be a LEED AP? or just a registered Architect?

1
Thu Apr 12, 2012, 6:54 pm

AHU measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Parada  on 

In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor. Do I need to perform measurements just in the two ma

1
Tue Dec 11, 2012, 7:37 pm

v2.2 CIR applied to v2009

General forums
posted by  Bill Swanson  on 

In another thread on this page, a LEED Reviewer mentioned being able to apply v2.2 "LEED Interpretations" to v2009 projects. That did not make sense to me.

0

'Leaks in Return Ducts and Air Handlers..be checked..repaired'

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Michelle Bracewell-Musson  on 

The Contractor will not be using the HVAC during a minor alteration and there is no HVAC scope except for Air balancing and cleaning of ductwork. How much sealing is required?

1
Fri Apr 13, 2012, 6:44 pm

Defined Flush out Area

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Thomas Boyd  on 

Hello everyone - Our project's registration details reference building square footage as 51,441. However, we've only finished 40,100 sqft.

1
Sun Apr 29, 2012, 6:03 pm

Kitchen Sinks in Dorms

NC-2009 WEc3:Water Use Reduction
posted by  Lauren Fakhoury  on 

We are working on a college dormitory and trying to calculate the daily uses for kitchen sinks. The only kitchen is on the first floor of the dorm and not in each dorm room.

1
Fri Apr 13, 2012, 4:43 pm