Forum quick links
Precertification
posted by Lawrence Lile on
I have never done a precertification process before, and the information in the reference guide and the USGBC website is quite brief.
EAc1.4
CI-2009 EAp2:Minimum Energy Performanceposted by Linda Delair on
Are the requirements for Energy Star office equipment,electronics and appliances only for those which are newly purchased?
Purchasing Carbon Offsets for Construction Vehicles
NC-2009 IDc1:Innovation in Designposted by Andrew Gil on
A local college (and long-time USGBC enthusiast) has asked me whether I thought it feasible to obtain an ID credit for the purchase of carbon offset for construction vehicles for an upcoming large
Dormitory project with no parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jay Murray on
We are working on a project in Boston. A new dormitory on a college campus. The project is the 17 story dormitory building, there is no new parking as part of this project.
EAp2-7 Example Spreadsheet
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
Can anyone point me towards an EAp2-7 example spreadsheet filled out complete for reference?
DES Option 1 or Option 2
NC-2009 EAc1:Optimize Energy Performanceposted by Katherine Ann Resurreccion on
If DES will serve multiple buildings "A","B","C" & "D". Buildings "A" and "B" are xisting but only "C" and "D" are candidates for LEED-NC certification.
Tile Grout Sealer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Eric Longfellow on
It seems like ceramic tile grout sealer should be considered as a "Waterproofing Concrete/Masonry Sealer" with a VOC limit of 400g/L The grout is a cement product.
Smoking Policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Doreen Kruschina on
I have a project in which two outside smoking areas are planed, the first one is for the worker of the plant and is much far away from windows and doors of the plant than necesary, the second one i
Two Stage CI LEED Assessment?
CI-2009 MRc2:Construction Waste Managementposted by Chris Hocknell on
Dear all, I am submitting a Two Stage LEED Assessment and I am not sure how to deal with credits such as The Site Waste Management Plan.
precertification leading to certification
posted by Lawrence Lile on
One thing that is not clear from the all-too-brief precertification info in the Guide, is that Precertification is supposed to lead to certification.