posted by Stéphane Paris on
I have a project to certify in France, this is an existing building which will be occupied during the work. The functionality of the building will be change for approximately 60% of the building.
official commenting closed here
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours, LEEDuser must close this forum as of now as an officlal place to comment.
official commenting closed here
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours, LEEDuser must close this forum as of now as an officlal place to comment.
EA forum closed for official commenting
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours, LEEDuser must close this EA forum as of now as an official place to comment.
With USGBC's comment period
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours (according to its homepage -- the only place I could find the 9 a.m.
Shower calculation
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Michael Smithing on
We have 330 FTE and 2 showers. The credit requirement is 1 shower for the first 100 FTE and 1 for each subsequent 200 FTE.
Slow Data Entry
posted by Brian Baril on
I am using IE to upload data into the materials credits, and the process is just mind-boggingly slow. To tab between cells on the online form takes a minimum of 10 seconds.
Baseline PTAC sizing
NC-2009 EAp2:Minimum Energy Performanceposted by April Ambrose on
I have a residential facility seeking LEED v2009 certification with small room loads (approx 2,000 BTU/hr).
Existing Parking Lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Dan Forino on
For a NC 2009 project we are building an addition to a building on an which will replace part of an existing campus parking lot.
v2009 NC Split Review
posted by Francisco Villela on
I have just submitted Design Preliminary Review for my project.