'Expected Volume for the Building' Question
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rebekah Burke on
How do we address the expected volume of recycling for the building question? This is a question we received recently on a design review, and I'm not certain how to address.
DES Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by SUNG SU KIM on
For HVAC System, Our project team will apply to 2 absorption chillers and geo-exchange heat pump.(project site is located in DES) In this case, we know that the baseline system of HVAC is absorpti
Consistency, Consistency, Consistency
posted by April Ambrose on
I think my main issue with this announcement is the lack of consistency in the way that USGBC/GBCI is making these decisions and announcements.
Speculative Project - Tenant Lease Upload
posted by Zachary Guren on
Our LEED Core & Shell project is a retail building that will have multiple tenants, but it is a speculative project (as we indicate at the top of the second page of PI Form 3).
Design for Adaptability
Pilot-Credits PC34:Design for Adaptabilityposted by Jeffrey Lewis on
As a Senior Building, this credit was pretty much a given.
Refueling Station As a Separate Project
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sarah Corbitt on
Hi, there. The project I'm submitting does not have parking within the project boundary. It's a Core and Shell renovation on a tight urban lot.
Benefits of LEED NC or CS
posted by Nathan Lee on
I am working on a mixed-use project which includes, office space, hotel, and some retail.
EU Standards vs LEED
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Tanja Arnesson on
We have some problem with the VOC (g/l) content in our products.
Reclaimed land near landfill
NC-2009 SSc3:Brownfield Redevelopmentposted by William Wong on
One of my projects choose to develop on a piece of land that is reclaimed and near an operating landfill and as thought in the design stage land contaminant would very likely to be found.
Energy Star Portfolio Manager for intenrational projects
EBOM-2009 EAc1:Optimize Energy Performanceposted by Anna Korinkova on
Hi all, We are working on a project in Belgrade - Serbia.