CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Rubén M. R. on
Does pedestrian areas located in the roofs count as open space?
The light fixtures currently
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Austin Evans on
The light fixtures currently installed meet the specified criteria however what do you do if the bulbs were replaced not too long ago and their lifetime will outlast a 2 year window.
Comments from a LEED review
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Raphael Sperry on
We just received comments on a review of this credit I am trying to understand. For this project, we actually had an approved MV plan from LEED NC credit EAc5.
cutsheets?
CS-2009 MRc6:Certified Woodposted by Sara Neff on
I'm confused on whether or not we need to provide product cutsheets, or if the invoices (line item, with dollar values and the CoC # and everything) are all we need to document this credit.
Are local SmartCommute Programs compliant with Option 2?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by John Kinch on
I see that the SmartCommute program is referenced as a way to provide incentive to building occupants to increase alternative commuting to work.
Manufacturing Plant Addition - Option 3
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Wascher on
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.
Lost IAQ Photos
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Melissa Wrolstad on
I am working on a project with an IAQ plan that was followed during construction.
Daily Average Building Occupants for WEc3
posted by David Mirabile on
How would you calculate your Daily Average Occupancy (for transients)?
Common services
posted by javier bolanos zeledon on
This is a retrofit of an existing office building within a medium manufacturing company. The office building is about 5000sq ft and the overall facility about 100 000sq ft.
Gravel Coeffecients
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Steve Walker on
I have 3 parking lots which are comprised of gravel (chat)....what would the coefficient for this be? I believe it should be less than any kind of pavement but more than grass.