Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Limiting access once the building is enclosed

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Vanessa Seibert  on 

Our experience on projects is that limiting the access to one door with a long, regularly cleaned carpet, is expected by the LEED reviewer.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Mon Mar 7, 2011, 10:52 pm

Exhausted heat

NC-2009 EAc1:Optimize Energy Performance
posted by  Kath Williams  on 

Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Mon Mar 7, 2011, 9:33 pm

Systems Furniture Panel Fabric

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Lori Selcer  on 

We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer.

5
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Sat Mar 5, 2011, 1:54 pm

Savings calculations

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Sundararaj Subburaman  on 

Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers.

4
Sat Mar 5, 2011, 4:57 am

Completing the LEED Template for WEp1

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  R Jones  on 

We are needing to go down the route of Case 4 where there are facilties in landlors and tenant areas but we can only pursue the WEp1 which is fine.

2
Green Building Consultant
The Cadmus Group
LEEDuser Basic Member
83 thumbs up
Fri Mar 4, 2011, 9:30 am

CxA from owner

posted by  TINGXI WANG  on 
7
Director of Commissioning & Critical System
Edwards & Zuck
LEEDuser Basic Member
29 thumbs up
Thu Mar 3, 2011, 11:06 pm

Hazardous Waste

NC-2009 MRc2:Construction Waste Management
posted by  Veronika Sundberg  on 

Hi, I’m currently working on a LEED project in Sweden. In overall we are very good at waste handling, but I think that we include different fractions in hazardous waste.

3
Default Avatar
Environmental Engineer - Certification
Skanska Sverige AB
LEEDuser Basic Member
94 thumbs up
Thu Mar 3, 2011, 8:47 pm
5
Project Manager
BNIM Architects
LEEDuser Premium Member
39 thumbs up
Thu Mar 3, 2011, 7:14 pm

ASHRAE 90.1-2007 Lighting Compliance Documentation

CI-2009 EAp2:Minimum Energy Performance
posted by  Natalie Terrill  on 

Page 3 of the ASHRAE Lighting Compliance Documentation has a table for Interior Lighting Compliance Test for Additional Lighting which reads Total Additional Interior Lighting Power Allownace (Watt

6
Principal & Founder
Perceptive Green, Inc.
LEEDuser Basic Member
11 thumbs up
Wed Mar 2, 2011, 8:38 pm

Energy Modelling For Standarg G

NC-2009 EAc1:Optimize Energy Performance
posted by  Mauricio Ramirez  on 

Hello. i have a doubt about this credit. We're working on a Children's Museum.

3
Wed Mar 2, 2011, 7:36 pm