Forum quick links
Path 7
CI-2009 SSc1:Site Selectionposted by Robin Dukelow on
I have a situation where the project team members are seeing different versions of the same form.
sensor vs. aerator
NC-2009 WEc3:Water Use Reductionposted by Ashley Nedza on
It seems that having a faucet with a sensor could actually save more water than a faucet with an aerator because the sensor will actually cut the water off. Does anyone have an opinion on this?
No change in HVAC?
CI-2009 EAp2:Minimum Energy Performanceposted by John-David Hutchison, LEED AP BD+C, PMP on
I have a client investigating LEED-CI for a upcoming project. Interior fit up, but no change in HVAC system for a building built in the 1980's. Does this prerequisite subscribe to existing HVAC o
Documentation requirements
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Erin Holdenried on
Hello, I have a project where a large area of existing forest, about 120 acres will be preserved. What kind of documentation is required for this credit?
Baseline HVAC type
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Marcus. We have a healt care building and I would like to know if my baseline HVAC model approach is correct. The building has 12 floors.
Cogen Gas Rates
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
Hello all, We are attempting to model a cogen system (using gas to create electricity and using waste heat for domestic water heating). My questions are as follows: 1.
LEED EBOM application day
EBOM-2009 MPR5:Must comply with minimum occupancy ratesposted by Geraldine Seguela RAIA on
We are a newly built hospital overseas. We have completed construction last April. But we're not operating yet.
Anti-corrosive primer and paint on external metal elements
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Joanna Bloniewska on
We need to apply an anti-corrosive primer and paint on metal elements, which are anchored into external face of main precast structure.
Borrowed Daylight
NC-v4 EQc7:Daylightposted by Razan Nejem on
when demonstrating a daylight simulation, shall the interior glazed areas be excluded from the calculation because light traveled through multiple layers of glazing
LEED Online V3 and web browser solutions?
posted by Allison Zuchman on
Revisiting an old issue, but perhaps updates have been made since I last checked....