Forum quick links
WEc4 and Rainwater Harvesting
Schools-2009 WEc4:Process water use reductionposted by Louise Schlatter on
Does anyone know of a rule that states you cannot include harvested Rainwater in your WEc4 calculations? As part of our submittal for an Innovation Point for Process Water Use Reduction in an Indu
Control Lightning
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Ramon Gomez on
We are currently working in a facility that that has a system called "Softswitch" from the Lutron Electronics Co.
Car parking and increased ventilation
NC-2009 IEQc2:Increased Ventilationposted by Timo Rintala on
I have a office project with 250 car parking facility, underground and mechanically ventilated. We are going for increased ventilation credit in all spaces.
Primer classification as non-flat paints?
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Joseph Greene on
Are primers classified an non-flat paints in all circumstances?
Chemicals of Concern
posted by Tom Lent on
Here's my take on what the credits are doing and some reactions from the HBN POV: The USGBC is taking very significant important steps forward with the Chemicals of Concern credits in LEED 2012.
Tenant-Managed Recycling Programs + Varied Collection Cycles
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Tamara Armstrong on
Aloha, Question 1: We are required to sort & weigh ALL building waste in our audit, but what about small tenant-managed recycling programs?
LEED Neighborhood Development
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Jessica Long on
If a building is part of a LEED Neighborhood Development project does that count toward this point for EB:O&M?
Exemplary Performance
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by renee jimenez on
We are currently doing a project registered under LEED for Schools 2009 and are using CASE 3 of SS5.2.
Detailed Plant Simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.
Fan Power in the Proposed Building Design (C&S)
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
I'm working on a project pursuing LEED Core&Shell Certification and I'm not sure about the following matter: What is the correct approach when simulating fan power in the proposed case for ten