LEED for Homes - OPR ?
posted by Mike Barker on
While it is not required officially by LEED for Homes ( i think ?
viscose
CI-2009 MRc6:Rapidly Renewable Materialsposted by Giselle Walsh on
If a product has cotton and viscose blend, can I the entire product be considered rapidly renewable or just the cotton portion?
PI Form 3 - Occupant and Usage Data
posted by David Groseclose on
Question was posted - I seem to be having trouble with this form. it continues to state that the form is not complete. Answer- Make sure all of the boxes that are blank have a zero in them.
no local zoning
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Christine Teichert on
I looked on the ITE website and can't find a free version of this "Parking Generation". Any thoughts on where to find this and how to navigate through it to find the exact table I'm looking for??
SRI for Corrugated metal roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Noriko Nagazumi on
Our project has corrugated metal roof like which can be shown by clicking the link below. http://www.sakata-s.co.jp/product/88.html The roof will be installed almost horizontally as a whole.
No New Parking - to document alternative compliance or not?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Cynthia Ottenbrite on
The project is an existing building - major renovation. The existing parking lot is being ripped up to drill the geothermal wells.
Energy Star Prerequisite - computer as process load
CI-2009 EAp2:Minimum Energy Performanceposted by Patricia Hancock on
We're an Applied Tech School that teaches CAD and complex simulation technologies.
Automation Session at Greenbuild Shows Potential
posted by Nadav Malin on
There's a live video now from the LEED Automation session at Greenbuild, at which various Automat
Granite for Paving
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Udana Ratnayake on
Has anyone proved credit compliance using granite as the paving material? what's the SRI of granite?
Project impacts another area not a part of the Project Boundary
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Melissa Kemp on
My question is: What if a LEED project disturbs land owned by a different party? i.e. if they have to excavate in an adjacent parking lot to install utilities for the building seeking LEED.