Zero employees did not commute due to an absence

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Alicia Villanueva  on 

We did the transportation survey to a huge building none of the persons responding the survey noted that they did not commute to the building due to absence, our reviewers noted that this is unlike

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Fri Feb 1, 2013, 3:02 am

Alternative Compliance Paths for projects Outside the U.S.

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Lewis Hewton  on 

Hi all, This alternative compliance path for projects outside US with no minimum parking requirements seems to exist http://www.usgbc.org/ShowFile.aspx?DocumentID=10335 However the referenced F

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 1, 2013, 2:02 am

VOC content for concret additive (curing enhancer)

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael E. Edmonds-Bauer  on 

Our project has a milan wall wich has some water filtrations, a mortar made out of cement and an additive is being used to seal these filtrations. The additive consists on a powder added to the co

4
Fri Feb 1, 2013, 1:23 am

Campus on-site solar installation

NC-2009 EAc2:On-Site Renewable Energy
posted by  Courtney Royal  on 

Hello! We have a Student Commons building going for certification on a campus.

5
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Thu Jan 31, 2013, 7:33 pm

Relationship with other existing buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all. We are working on a building whose reversible heat pump serves also another building not included in the LEED boundary. How do we have to consider this situation?

9
Thu Jan 31, 2013, 6:38 pm

Definition of Street / Paseo

ND-v2009 NPDp3:Connected and open community
posted by  Omer Moltay  on 

Hi, We are having difficult interpreting the credits related to street frontages and connectivity, as our project is a pedestrian shopping district with non-motorized walking paths between two sto

6
Co-founder
Mimta EcoYapi
LEEDuser Basic Member
133 thumbs up
Thu Jan 31, 2013, 6:33 pm

Waste Diversion : Trees

NC-2009 MRc2:Construction Waste Management
posted by  Mark Cloud  on 

We are having to remove a couple of medium trees from the site. We will be sending these to the local city for mulching, which will be used as landscape materials for residences.

4
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Jan 31, 2013, 6:15 pm

Water Bodies

Schools-2009 SSc1:Site Selection
posted by  PAULA HIDALGO  on 

I have a school project that is actually the reconstruction of the school in the same site that it was previously located.

3
Thu Jan 31, 2013, 4:54 pm

Interpolation of bimonthly water bills for monthly summaries

EBOM-2009 WEc1:Water Performance Measurement
posted by  Ryan Nelson  on 

Similar to how extrapolation of data for a submeter that was recently installed is appropriate, can I interpolate between bimonthly water bills in order to produce the monthly consumption summary?

3
Thu Jan 31, 2013, 4:51 pm

Precertification and site/building area change

General forums
posted by  Sandro Tubertini  on 

Is it there any problem to have a building precertified even so the site and building might be changed for design-construction regular certification? It is very important to have a direction on th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jan 31, 2013, 3:02 pm