Forum quick links
light controls for exam rooms
posted by Susan Walter on
Elizabeth, The light controls are typically for workers and include patients when they will be there for a long time.
LEED Healthcare Forum
posted by Susan Walter on
Tristan, What are the plans to have LEED HC have its own forum like the other programs?
Fire Caulk
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Lu Anne Nielsen on
Does fire caulk fall under "other sealants"?
AREA CRITERIA
CS-2009 EAp2:Minimum energy performanceposted by RICARDO GUEMEZ DIAZ on
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.
Entrance lobby as live-work space
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
In my project there is a main entrance lobby that includes a permanently manned reception.
Sidewalk definition
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. There are no defined sidewalks and nor driveways on the pl
EAp2 Case 2B Fulfillment
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Jessica Bruscato on
Being that my project is a convention center, it does not qualify for energy star.
Green Roof Installation Timing
NC-2009 SSc7.2:Heat island effect - roofposted by Jeremy Knoll on
I am working on a green roof in St. Louis, MO which is due to be complete by October.
Compliance with Appendix G ASHRAE
CS-2009 EAp2:Minimum energy performanceposted by Daniela Castro Salgado on
We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems: 1. The client does not want a water treatment plant. 2.
Site Master Plan - Light Pollution Reduction
Schools-2009 SSc9:Site master planposted by Anya Fiechtl on
Has anyone completed the light pollution portion reductin of this credit? Our project is an elementary school on a remote site that may accommodate future structures (classroom addition, staff hou